![]() Before accepting human remains, the reduction facility must verify that identification is attached to the container, shroud, or human remains.(b) A reduction facility operator may unwrap human remains prior to reduction for the sole purpose of verifying identification. The disc or tag identification number must be recorded on all paperwork regarding a human remains.)) (1)(a) A reduction facility must not take custody of unidentified human remains. The metal identification disc or tag must identify the crematory and accompany the human remains through each phase of the cremation, processing and packaging. An identification number assigned each human remains and in- scribed on a metal disc or metal tag.Description of the cremation container to be consumed with the human remains.Name of firm engaging crematory services.Name and relationship of authorizing agent.Upon accepting human remains for cremation, the crematory must make a permanent record of the fol- lowing: Before accepting human remains, the crematory must verify that identification is attached to the cremation container. ((A crematory must not take custody of unidentified human remains. AMENDATORY SECTION ( Amending WSR 07-03-027, filed 1/5/07, effective 2/5/07) WAC 308-47-020 Receipt and identification of human remains. Shroud means a leak resistant covering for human remains prior to alkaline hydrolysis, or natural organic reduction to ensure privacy and respectful handling of human remains. Shroud with inlet opening to introduce helium gas and an opening for measuring helium concentration 3. ![]() Shroud adjustment - Adjustment of shroud length shall be made only by means of open body turnbuckles, Ronstan Sealoc turnbuckles or single or double column shroud adjusters. The Bidder may withdraw its Proposal after the Proposal’s submission, provided that written notice of the withdrawal is received by the IPSC prior to the deadline prescribed for submission of Proposals. It was during a spell of wet weather that the Lady of the Shroud came to me. Shroud Pressure relief Device will be used and have provision of discharge of oil from PRD to safe place by closed pipeline. Such changes will become effective thirty (30) days after they have been posted to the website or We Care Arts has otherwise notified you of the change. ![]() The Energy Solutions site-specific classification of radioactive wastes for the SONGS Plant identified that the spent fuel assemblies and two components within the reactor vessel (the Core Shroud Assembly and the Lower Core Grid Plate) will exceed Class C limitations. Shroud the machine to prevent discharging loosened material into adjacent work areas or live traffic lanes. Shroud the drum to prevent discharging loosened material onto adjacent work areas or live traffic lanes. Shroud the machine to prevent discharge of any loosened material into adjacent work areas or live traffic lanes. ![]()
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |